The main difficulty of this project is the installation of three vaulted structures in the boiler furnace to ensure the design features of the boiler plant of the KTVm-5000 boiler manufacturer (Kovrovskie Kotly LLC, Kovrov). To ensure the strength of the structure of the masonry of the vaulted part, as well as the brickwork of straight walls, a number of technical measures were carried out using special supports and anchoring products for brickwork.

Read more: