The complexity of this project is due to the need for partial replacement of the existing lining, its adjoining to the existing wall lining, the design of a flat vault with a transitional cylindrical section, as well as the need to solve the constantly arising problem of destruction of the refractory lining on the inclined and horizontal sections of the flat vault of the TOH.